Skip to main content
Home DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES

FOREIGN-ASSISTED AND SPECIAL PROJECTS SERVICE eLibrary
  • Home
  • Knowledge Products
    • Photographs
    • Publications
    • Videos
  • FASPs Project Completion Report
  • List of Projects
  • LGIS Database
  • Contact Details
  • Client Feedback

FOREIGN-ASSISTED AND SPECIAL PROJECTS SERVICE
eLibrary

Project Completion Reports

Report for the Terminal Evaluation (TE) of the Expanding and Diversifying the National System of Terrestrial Protected Areas in the Philippines Project (NewCAPP)

The varied purposes of evaluation exercises include monitoring results as well as effects/impacts and promote accountability. This evaluation centers, therefore, upon valuating the outcomes, outputs, products, and processes achieved by Expanding and Diversifying the National System of Terrestrial Protected Areas in The Philippines Project. The specific objectives of the evaluation were to determine if and how project results were achieved, and to draw useful lessons that can both improve the sustainability of benefits from this project as well as to aid in
  • Read more about Report for the Terminal Evaluation (TE) of the Expanding and Diversifying the National System of Terrestrial Protected Areas in the Philippines Project (NewCAPP)

Natural Resources Management and Development Project (NRMDP) - Mining Titles Component: Project Completion Report

This report discusses the results of the implementation of the Philippine Mining Titles Computerization Project (MTCP) a component of the Natural Resources Managment and Development Project (NRMDP). This project aimed to provide a basis for speedier and more efficient administration of rights to explore for and mine mineral resources through the establishment of a micro-computer based system for the administration of mining titles and the management of mining titles data and a training thereof.
  • Read more about Natural Resources Management and Development Project (NRMDP) - Mining Titles Component: Project Completion Report

Metro Manila Air Quality Improvement Sector Development Program : Project Completion Report

This Project Completion Report was prepared by the DENR as the lead executing agency of the Manila Air Quality Improvement Sector Development Program (MMAQISDP). This program promotes policy reforms to improve air quality through abatement of mobile and stationary sources of air pollution, focusing on Metro Manila and the surrounding provinces.
  • Read more about Metro Manila Air Quality Improvement Sector Development Program : Project Completion Report

Strengthening the Philippines’ Institutional Capacity to Adapt to Climate Change : Final Evaluation

In more recent times, the Philippines experienced a number of natural disasters which has placed it among the list
of countries that have become most vulnerable to the negative effects of climate change. Latest empirical studies
have also indicated climate changes in the country in terms of temperature increases and occurrences of extreme
heat and rainfall. The total cost of extreme events related to climate change is believed to be high, at around 2.7%

  • Read more about Strengthening the Philippines’ Institutional Capacity to Adapt to Climate Change : Final Evaluation

The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines: Final Report

The Study covered: capacity development for topographic mapping at scale of 1: 50,000 of National Mapping & Resource Information Authority (NAMRIA); and pilot projects. The pilot projects included technical verification of mapping methods and technology transfer. Based on the results of the study components, recommendations of the nationwide development plan and action programs were prepared. The topographic mapping at scale of 1:50,000 for technical verification and technology transfer was conducted in the area of the Pampanga watershed using digital mapping methodologies.
  • Read more about The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines: Final Report

Terminal Evaluation of the UN Environment GEF Project “Removing Barriers to Invasive Species Management in Production and Protection Forests in South East Asia” (FORIS)

This report is a terminal evaluation of a UN Environment-GEF project implemented between 2012 and 2016. The project's overall development goal was to enhance the capacity of four pilot countries (Cambodia, Indonesia, Philippines and Viet Nam) to manage invasive alien species, particularly in forest ecosystems, by strengthening existing national frameworks for the prevention and management of invasive alien species. The evaluation sought to assess project performance (in terms of relevance, effectiveness and efficiency), and determine outcomes and impacts (actual and potential) stemming from
  • Read more about Terminal Evaluation of the UN Environment GEF Project “Removing Barriers to Invasive Species Management in Production and Protection Forests in South East Asia” (FORIS)

Final Report : Protection and rehabilitation of coastal ecosystems for improved adaptation to Climate Change as a contribution to the Coral Triangle Initiative (ACCCoast)

The overarching project goal was to improve governance of MPAs contributing to improved climate change adaptation and biodiversity conservation.

The project has had significant impacts on the political and social domains related to MPA governance. Best practices of communities were identified and further developed. For enhanced outreach, results and lessons learned were shared among coastal communities at the national level, disseminated up to the regional policy-making level (CTI, ACB) and even

  • Read more about Final Report : Protection and rehabilitation of coastal ecosystems for improved adaptation to Climate Change as a contribution to the Coral Triangle Initiative (ACCCoast)

Completion Report of the Philippine Environmental Governance Project (EcoGov) Phase 1

This paper synthesizes the various concepts and ideas that emerged during the implementation of the Philippine Environmental Governance (EcoGov) Project Phase 12 (from December 1, 2001 to November 30, 2004). Reflecting on the Project’s two-and-ahalf years of experience, this paper tries to draw certain ideas from the lessons learned and recommendations made that could serve as a “think piece” for consideration in the implementation of EcoGov 2.
  • Read more about Completion Report of the Philippine Environmental Governance Project (EcoGov) Phase 1

Project Completion Report: Muleta-Mapanuli Watershed Development Project

The Muleta-Mapanuli Watershed Development Project (MMWDP) is the soil conservation component of the Bukidnon Irrigation Project (BIP). It was tasked to overcome the problem of soil erosion in the areas and the silting of the Muleta and Mapanuli rivers. This document presents the entire project life from the appraisal stage to implementation stage. it also reports the project's operating, financial and institutional performance and development.
  • Read more about Project Completion Report: Muleta-Mapanuli Watershed Development Project

Updating of the Master Plan on Water Resources Management in Two (2) Selected River Basins (Pampanga River Basin and Tigum Aganan River Basin) Phase 1 : Final Report

The Master Plan Study on Water Resources Management spearheaded by the National Water Resources Board and undertaken under the Japan International Cooperation Agency (JICA) was completed in August 1998. The study identified 9 areas which would encounter water constraint in the near future. Nine cities include Baguio City, Angeles City, Metro Manila, Iloilo City, Bacolod City, Metro Cebu, Cagayan de Oro City, Davao City and Zamboanga City. The Study was formulated and proposed water resources development plan adopting
  • Read more about Updating of the Master Plan on Water Resources Management in Two (2) Selected River Basins (Pampanga River Basin and Tigum Aganan River Basin) Phase 1 : Final Report
  • first
  • previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • …
  • next
  • last