Skip to main content
Home DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES

FOREIGN-ASSISTED AND SPECIAL PROJECTS SERVICE eLibrary
  • Home
  • Knowledge Products
    • Photographs
    • IEC Materials
    • Annual Report
    • Publications
    • Videos
  • Documents
    • Agreements
    • Reports
    • Project Documents
    • Others
    • All Documents
  • Contact Details
  • Client Feedback
  • FASPs Project Completion Report
  • List of Projects

FOREIGN-ASSISTED AND SPECIAL PROJECTS SERVICE
eLibrary

Project Completion Reports

The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines: Final Report

The Study covered: capacity development for topographic mapping at scale of 1: 50,000 of National Mapping & Resource Information Authority (NAMRIA); and pilot projects. The pilot projects included technical verification of mapping methods and technology transfer. Based on the results of the study components, recommendations of the nationwide development plan and action programs were prepared. The topographic mapping at scale of 1:50,000 for technical verification and technology transfer was conducted in the area of the Pampanga watershed using digital mapping methodologies.
  • Read more about The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines: Final Report

Terminal Evaluation of the UN Environment GEF Project “Removing Barriers to Invasive Species Management in Production and Protection Forests in South East Asia” (FORIS)

This report is a terminal evaluation of a UN Environment-GEF project implemented between 2012 and 2016. The project's overall development goal was to enhance the capacity of four pilot countries (Cambodia, Indonesia, Philippines and Viet Nam) to manage invasive alien species, particularly in forest ecosystems, by strengthening existing national frameworks for the prevention and management of invasive alien species. The evaluation sought to assess project performance (in terms of relevance, effectiveness and efficiency), and determine outcomes and impacts (actual and potential) stemming from
  • Read more about Terminal Evaluation of the UN Environment GEF Project “Removing Barriers to Invasive Species Management in Production and Protection Forests in South East Asia” (FORIS)

Final Report : Protection and rehabilitation of coastal ecosystems for improved adaptation to Climate Change as a contribution to the Coral Triangle Initiative (ACCCoast)

The overarching project goal was to improve governance of MPAs contributing to improved climate change adaptation and biodiversity conservation.

The project has had significant impacts on the political and social domains related to MPA governance. Best practices of communities were identified and further developed. For enhanced outreach, results and lessons learned were shared among coastal communities at the national level, disseminated up to the regional policy-making level (CTI, ACB) and even

  • Read more about Final Report : Protection and rehabilitation of coastal ecosystems for improved adaptation to Climate Change as a contribution to the Coral Triangle Initiative (ACCCoast)

Completion Report of the Philippine Environmental Governance Project (EcoGov) Phase 1

This paper synthesizes the various concepts and ideas that emerged during the implementation of the Philippine Environmental Governance (EcoGov) Project Phase 12 (from December 1, 2001 to November 30, 2004). Reflecting on the Project’s two-and-ahalf years of experience, this paper tries to draw certain ideas from the lessons learned and recommendations made that could serve as a “think piece” for consideration in the implementation of EcoGov 2.
  • Read more about Completion Report of the Philippine Environmental Governance Project (EcoGov) Phase 1

Project Completion Report: Muleta-Mapanuli Watershed Development Project

The Muleta-Mapanuli Watershed Development Project (MMWDP) is the soil conservation component of the Bukidnon Irrigation Project (BIP). It was tasked to overcome the problem of soil erosion in the areas and the silting of the Muleta and Mapanuli rivers. This document presents the entire project life from the appraisal stage to implementation stage. it also reports the project's operating, financial and institutional performance and development.
  • Read more about Project Completion Report: Muleta-Mapanuli Watershed Development Project

Updating of the Master Plan on Water Resources Management in Two (2) Selected River Basins (Pampanga River Basin and Tigum Aganan River Basin) Phase 1 : Final Report

The Master Plan Study on Water Resources Management spearheaded by the National Water Resources Board and undertaken under the Japan International Cooperation Agency (JICA) was completed in August 1998. The study identified 9 areas which would encounter water constraint in the near future. Nine cities include Baguio City, Angeles City, Metro Manila, Iloilo City, Bacolod City, Metro Cebu, Cagayan de Oro City, Davao City and Zamboanga City. The Study was formulated and proposed water resources development plan adopting
  • Read more about Updating of the Master Plan on Water Resources Management in Two (2) Selected River Basins (Pampanga River Basin and Tigum Aganan River Basin) Phase 1 : Final Report

Joint Terminal Evaluation Report for the Project on Establishment of Ecological Solid Waste Management System in Three Cities in the Philippines

This report was the result of the terminal evaluation mission of the Establishment of Ecological Solid Waste Management System in Three Cities in the Philippines Project . Evaluation by five evaluation criteria nemely, (a) relevance, (b) Effectiveness, (c) efficiency, (d) impact and (e) sustainability were used in the mission. Results, conclusion, recomendations and lessons learned were presented.
  • Read more about Joint Terminal Evaluation Report for the Project on Establishment of Ecological Solid Waste Management System in Three Cities in the Philippines

Project Completion Report of Integrated Forest Protection Pilot Project-B, Dona Remedios Trinidad, Bulacan

This terminal report covers all the results of activities undertaken during the eight years implementation of the Integrated Forest Protection Pilot Project-B, Dona Remedios Trinidad, Bulacan. The lessons learned related to the operation of the project are likewise included as well as the recommendations and suggestions to serve as future references.
  • Read more about Project Completion Report of Integrated Forest Protection Pilot Project-B, Dona Remedios Trinidad, Bulacan

Subproject Completion Report: STAGBAK Mangrove Rehabilitation Subproject

The STAGBAK Mangrove Subproject covers Barangays Sta. Lourdes, Tagburos, Bacungan and Kamuning, all on the southeast border of Palawan and involves a total of 1,861.28 hectares. Rehabilitation of these areas had to be initiated to arrest its deteriorating condition brought about land conversion activities in some portions. Add to this the fact that Palawan, renowned as the last frontier, has one of the most picturesque sceneries in the country and therefore has a significant role in tourism.

  • Read more about Subproject Completion Report: STAGBAK Mangrove Rehabilitation Subproject

Subproject Completion Report: Ubay-Mabini –Alicia Watershed Rehabilitation Subproject

Ubay-Mabini –Alicia Watershed Rehabilitation Subproject is located in the municipalities of Ubay, Mabini and Alicia, Bohol. This is a part of the most important watershed in the province of Bohol. It provides water supply for the domestic needs of the nearby municipalities and its barangays and supports two dam structures of the National Irrigation Administration. These two dams supports the irrigation needs of thousands of hectares of rice fields downstream.

The people’s organizations, Ubay Federated Tree Planters Association Inc,

  • Read more about Subproject Completion Report: Ubay-Mabini –Alicia Watershed Rehabilitation Subproject
  • first
  • previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • …
  • next
  • last