Skip to main content
Home DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES

FOREIGN-ASSISTED AND SPECIAL PROJECTS SERVICE eLibrary
  • Home
  • Knowledge Products
    • Photographs
    • Publications
    • Videos
  • FASPs Project Completion Report
  • List of Projects
  • LGIS Database
  • Contact Details
  • Client Feedback

FOREIGN-ASSISTED AND SPECIAL PROJECTS SERVICE
eLibrary

Agusan River Basin Integrated Water Resources Management Project: Final Report

Poyry IDP Consult, Inc.. (2011). Agusan River Basin Integrated Water Resources Management Project: Final Report. Technical reports made for the Department of Environment and Natural Resources (DENR) and Asian Development Bank (ADB).
 

BACKGROUND

The Master Plan for the Agusan River Basin Project TA (TA 4552-PHI) was carried out from August 2005 to July 2006. The draft final reports were extensively reviewed and revised, and the master plan was developed into an “enhanced master plan”, with the last version of the final report submitted in May 2008.

 

A Pre-PPTA consultancy under the same TA (TA 4552-PHI) began in April 2008 to take the process forward. A workshop was held on 6-7 May 2008 in Davao City to review the enhanced master plan and to develop project prioritization criteria for the PPTA resulting from a technical working group (TWG) scoping workshop held on 22-23 April in Butuan City. The review of the enhanced master plan report concluded that the master plan could not be fully accepted due to some gaps and shortcomings in data gathering/analysis and stakeholder consultation, and a resolution was crafted endorsing it as a “rolling reference document”.  

 

A list of identified priority projects was presented at a workshop in Davao City on 1214 August 2008 for stakeholder dialogue, visioning and project validation. [...]

 

This report consist of the following:

  • Volume 1 Main Report
  • Volume 2 Report and Recommendation of the President, and Project Administration Manual
  • Volume 3 Supporting Reports: Watershed Rehabilitation, Biodiversity Conservation, and Related Social and Indigenous Peoples Development
  • Volume 4 Supporting Reports: Infrastructure Development
  • Volume 5 Supporting Reports: Institutional Development, Capacity Building, Financial Management Assessment, and Financial and Economic Analyses 
  • Volume 6 Supporting Reports: Safeguards
  • Volume 7 Supporting Reports: Field Surveys (CD softcopy only)
  • Volume 8 Supporting Reports: Stakeholder Consultations (CD softcopy only)

 

Author: 
Poyry IDP Consult, Inc.
Subject: 
Agusan River Basin -- Watershed resources management
Watershed management
File: 
PDF icon Main Report , Vol. 1
PDF icon Report and Recommendation of the President, and Project Administration Manual, Vol. 2
PDF icon Supporting Reports: Watershed Rehabilitation, Biodiversity Conservation, and Related Social and Indigenous Peoples..., Vol. 3
PDF icon Supporting Report: Infrastructure Development, Vol. 4
PDF icon Supporting Report: Safeguards, Vol. 6
Project Title: 
Agusan River Basin Integrated Water Resources Management Project
Publication Type: 
Technical Assistance (TA)